Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2608

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 天使萌一区二区在线观看| 国产精品高清一区二区三区不卡| 免费福利在线| 国产亚洲自拍一区| www.草草影院| 四虎影在永久地址在线观看| 免费一级淫片| 久久成人免费电影| 国内精品久久久久久久| 国产成人综合精品| va在线视频| 夜夜骑狠狠干| 五月婷婷激情在线| 日韩欧美一区在线观看| 欧美精品 破 过程| 久久五月网| 久草视频资源在线| 国内精品久久久久久麻豆| 国产成人一区二区三中文 | 奇米7788| 免费看电影网址| 久久精品综合| 精品久久久久久| 国产永久免费高清在线观看| 国产高清在线精品一区二区三区| 99在线视频免费观看| 66精品综合久久久久久久| 亚洲国产综合视频| 五月婷六月婷婷| 婷婷欧美| 五月开心综合| 婷婷激情五月网| 四虎国产精品永免费| 日本久久久久久久久久| 漂亮的保姆4| 热久久最新| 日本欧美久久久久免费播放网| 欧美一区二区在线播放| 欧美一区二区三区不卡免费| 欧美精品九九99久久在免费线| 免费看色网站|