Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2321

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 99热成人精品热久久669| 精品久久九九| 视频一区 国产| 六月婷婷啪啪| 韩国av片永久免费| 第四色最新网站| 色婷婷综合欧美成人| 热99re久久精品精品免费| 久久久不卡国产精品一区二区| 国产精品久久久久免费| 99精品福利视频| a级高清免费| 日日操网| 欧美性视频在线播放| 蜜臀.com| 久久国产精品-国产精品| 国产最新自拍| 国产精品美女| 成人精品一区二区www| 97免费在线观看| 亚洲午夜国产精品| 日韩伊人网| 日韩精品午夜视频一区二区三区| 欧美久久网| 欧美日屁| 欧美日韩中文一区| 欧美日韩视频在线播放| 美女网站免费福利视频| 久久久久久99| 久久久久九九精品影院| 久久精品免费视频观看| 久久久久久国产视频| 九九精品成人免费国产片| 黄色的视频免费观看| 国产亚洲综合视频| 国产午夜视频在线观看| 国内精品一区二区三区app| 国产这里有精品| 激情五月婷婷丁香| 九月丁香激情综合婷婷玉立| 九九成人免费视频|