色五月视频,久中文字幕中文字幕亚洲无线,国产大片在线看,欧美啪啪精品,国产精品欧美日韩,国产福利在线观看永久免费

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.qmdif.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4653

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美亚洲国产视频| 成 人 黄 色 视频免费播放| 亚洲成人第一页| 九九精品免费观看在线| h小视频在线观看网| 男人天堂网www| 国产成人精品在线观看| 色视频网站在线观看| 国产日韩视频在线观看| 99精品热视频| 日本精品不卡| 久久久久亚洲视频| 黄色网址在线视频| 国产精品99久久| 伊人久久艹| 日韩一区二区免费视频| 久久riav.com| 国产午夜一区二区在线观看| 国产成人羞羞电影网站在线观看| 97免费在线| 亚洲黄色激情网| 国产福利在线观看永久免费| 日本一区二区三区四区不卡| 欧美日韩亚洲国产精品一区二区| 国产午夜精品福利| 国产福利一区二区三区| 成人欧美1314www色视频| 99热这里只有精品久久免费| 91精品久久久久久久久久| 一级久久| 亚洲国产精品久久久久| 色综合久久综合网| 奇米影视第四色在线| 欧美日韩中文字幕久久伊人| 你懂的手机在线视频| 欧美成人精品一区二三区在线观看| 免费毛片网站在线观看| 华人永久免费视频| 狠狠色婷婷七月色综合| 狠狠综合网| 加勒比在线|