Steel supervision next station control points

Time:[2016-1-20]  Hits:4578

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 四虎永久网址| 国产免费播放一区二区| 欧美日韩另类在线观看视频| 激情网网站| 国产高清好大好夹受不了了| 久久天天躁狠狠躁夜夜躁综合| 日韩欧美在线一级一中文字暮| 免费观看毛片网站| 九九精品久久久久久噜噜中文| 国产精品久久免费| 99热这里只有精品69| 精品高清国产a毛片| 日韩视频在线免费观看| 男人的天堂2021| 久久免费小视频| 精品乱码一区二区三区在线| 国产精品原创视频| 国产99视频在线观看| 777影视电视剧免费看| 伊人网站在线观看| 天天想你在线视频免费观看高清版| 欧美精品一二三| 免费播放aa在线视频成人| 久久99精品久久久久久欧洲站| 国产在线观看青草视频 | 嫁给哑巴渔夫 在吃鸡排| 国产玖玖在线| 国产成人精品视频| 草草福利影院| 97在线观看中心| 欧美激情亚洲精品日韩1区2区| 午夜精品视频| 无人码一区二区三区视频| 日韩欧美视频一区二区| 青草精品| 欧美自拍偷拍| 奇米第八色| 日本欧美国产精品第一页久久| 欧美一区日韩一区中文字幕页| 欧美精品福利视频| 欧美精品久久久久久久影视|